More than 10km of Excel PE piping was specified for a new wastewater network in Ayrshire that will provide additional capacity for storm and floodwaters protecting properties from flooding and safeguarding the environment.

The contractor and project management team from Morrison Black & Veatch Joint Venture (MBV) created a new waste water network as part of a multi-million investment programme to help protect local coastal waters and rivers.

Explains Alastair Graham, Senior Project Manager at Scottish Water:

“Combined sewer overflows (CSOs) have traditionally provided an important failsafe to prevent storm water and domestic sewage from backing up and causing floods following heavy rainfall, however, the new waste water network will provide an equally efficient but much more environmentally friendly solution to this issue.”

The project was divided into three parts: WP6.1 (Kilmarnock), WP6.2 (rising main from Gatehead up to and including a new inlet works at Meadowhead WWTW) and WP6.3 (Irvine). Within WP6.2, 4.5km of 1000mm PE pipe was laid under largely arable land in the rural areas surrounding the Meadowhead WWTW, while 2km of 900mm PE pipe will be installed between the Drybridge Rail crossing (trenchless crossing) and Meadowhead WWTW.  GPS has supplied the entire PE piping requirement for this project and all sizes have been supplied in SDR26 to accommodate the flow rates and durability required by the specification.

The pipe installation in the arable land areas of the project involved straightforward excavation of open trenches and lengths of the PE pipe were welded together and lowered into the trench, which then was backfilled.  In the areas below Irvine and Kilmarnock, the installation was much more challenging as existing services had to be diverted and where services are very congested or there are rivers or dual carriageways, the contractor constructed tunnels.  Within the tunnelled areas, the PE pipe was substituted for ductile iron pipe and these sections will be joined to the PE pipe using flange connectors.

Adds Stewart Cochran from MBV:

“This is a complex installation but, once completed in 2012, it will provide a durable and environmentally responsible approach to managing waste water levels following heavy rainfall.”

Download Ayrshire Wastewater Network case study

Select Case Study By

Other case studies in this sector

Wish List

This product has been added to your requirements list. To check your requirements list, look under the left hand side navigation.

Once you have added all your products, you can print them all out in a list.